Documents Required
- Applicant's name, mobile number and address
- Aadhaar/PAN or other accepted identity proof, as required
- Property address and road location
- Building plan approval or related property documents, if applicable
- Purpose of road cutting (water, drainage, electricity, internet, etc.
- Proposed cutting length, width and route
- Utility connection approval or supporting documents, if applicable
Pricing
| Service | Price (₹) |
|---|---|
| Price On Consultation | |
Add to Cart
Service Details
Types
- Residential Road Cutting Permission
- Commercial Road Cutting Permission
- Public Utility / Infrastructure Road Cutting Permission (for water, gas, electricity, telecom, etc.)
Benefits
- Legally allows excavation or alteration of public roads for utility connections or repairs
- Prevents penalties and legal issues from unauthorized digging
- Ensures safety and restoration of the road after work completion
- Facilitates timely access to essential services like electricity, water, and internet
- Helps maintain coordination with local municipal or public works departments
Eligibility
- Applicant must be the property owner, builder, or authorized utility agency
- Purpose must be genuine — such as laying pipelines, cables, or drainage connections
- Application should include road layout, purpose details, and restoration plan
- Permission must be obtained from the local municipal corporation, PWD, or concerned authority
- Security deposit or restoration fee may be required before approval
Step-by-Step Process
- Identify the Road Authority: Confirm whether the road comes under BBMP/GBA, a municipal authority, Gram Panchayat, PWD or NHAI.
- Prepare Required Documents: Keep property details, applicant ID and address proof, building plan/approval if applicable, purpose of road cutting, location details and utility connection documents ready.
- Submit the Application: Apply through the relevant authority's online portal or submit the application to the concerned engineering office.
- Site Inspection: The concerned engineer verifies the location, road type, length and width of the proposed cutting.
- Fee Estimation: The authority calculates road-cutting and road-restoration charges and issues a demand notice.
- Pay the Fees: Pay the prescribed charges through the approved payment method.
- Receive Permission: Obtain the official permission before starting any excavation.
- Carry Out the Work: Complete the approved work within the permitted period, following safety requirements and the approved route.
- Restore the Road: Repair the cut portion as required by the authority.
- Final Inspection: The concerned engineer verifies the work and road restoration.
Government Fee: As per the applicable road-cutting and restoration charges assessed by the concerned authority. The exact amount is generated through the demand note after verification and site assessment.
Approximate Approval Time: 15 to 30 working days
Price Covers -Service + executive + admin + support: – end-to-end assistance including documentation, online uploads, portal management, expert consultation, printing and support from a dedicated relationship executive.
Note : Our service charges may vary depending on the specific requirements of each client. Prices are determined individually for every service based on scope, complexity, and customization needs. A detailed quotation will be provided after understanding your exact requirements.
Your Priority Access Starts Here, Discover the Benefits of DocZee Membership
Join DocZee Membership and unlock a smarter service experience with dedicated executive assistance, priority support, exclusive member discounts, fast-track services, and personalized support. Choose your plan and become a DocZee Member today. Click the link- https://doczee.in/membership_login